Industrial Engineering

B29. Hayloft, offices and milking building, Kotel, Bulgaria

Contractor: „Krystevi 2013“ LTD
Total built-up area: 1050 sq.m.
Phase: Technical project
Architecture: Orthos Design – arch.D.Zahariev

Designing steel hayloft with concrete office building in it.
Designing milking building.
SenovalIDoilna_00 SenovalIDoilna_01 SenovalIDoilna_02 SenovalIDoilna_03