Before starting to build, AVV assesses every aspect of the construction process, the access of building mechanization and the technological opportunities of the construction site.
Before starting the project and designing the building, AVV performs a comprehensive study and contrives the most rational constructive scheme.
AVV manufactures steel structures. We own a workshop equipped with steel-processing machines as well as building mechanization to enable assembly on any construction site.
AVV does formwork, reinforcement and concrete work.
AVV calculates structures precisely according to contemporary regulatory documents. Therefore there is no additional material applied in the final design.
AVV presents its project with detailed drawings of the preliminary, technical and final design.
No matter what the scope of work on a current project, it is always modelled in a three-dimensional environment, which enables the accomplishment of complex architectural ideas or technological flow lines, facilitates the participation of others in the construction process and visualizes the project to the investor.
AVV owns licenced software of modern BIM and FEM programs:
This assists us in accelerating our work speed and makes us competitive.
AVV planned and conducted an experimental programme to test three typical portal frames. The results helped to optimize material usage in our projects.