Contractor: Bourgas Municipality
Total built-up area: 5650 sq.m.
Phase: Technical and final design
Architecture: Kadinovi bros LTD
Project of steel hall on technical and final deisgn (arround 800 tons) and all steel parts of the project. Beta Consult 1 LTD design the concrete project.